Air conditioning thermal balance test room
This laboratory uses the thermal balance method to test the cooling capacity, heating capacity, power consumption, and C. of room air conditioning O.P.。 Its experimental state is close to the actual working state of room air conditioning, and the measurement results on the inside of the room can be verified by the measurement results on the outside of the room. Therefore, it is usually used as a benchmark laboratory for measuring the capacity of room air conditioning. The laboratory conditions comply with the requirements of GB/T 7725-2004 and JIS B 8615-1.
The measurement principle of this laboratory is to measure the performance of the air conditioner by balancing the cooling capacity and dehumidification capacity of the tested air conditioner during cooling, or the heating capacity during heating, by inputting (or extracting) heat and water; The test results are based on the results measured on the indoor side, with the outdoor side as a supplementary measurement for verification. The difference between the results measured on the outdoor side and the indoor side should be within ± 4%.
Test project
1. Rated cooling capacity test
2. Rated heating capacity test
3. Intermediate cooling capacity test
4. Intermediate heating capacity test
Technical specifications (the following specifications are for reference only and can also be customized according to user requirements)
1. Typical experimental conditions:
working conditions | Indoor air condition(℃) | Outdoor air condition(℃) | ||
Dry Bulb Temperature | Wet bulb temperature | Dry Bulb Temperature | Wet bulb temperature | |
Rated cooling capacity | 27 | 19 | 35 | 24 |
Rated heating capacity | 20 | <15 | 7 | 6 |
2. Cooling capacity test range: 1.5-8 kW
3. Heating capacity test range: 1.5-9 kW
4. Dry bulb temperature control accuracy: ± 0.1 ℃
5. Wet bulb temperature control accuracy: ± 0.1 ℃
6. Repeatability accuracy: ± 1%
7. Accuracy and precision: ± 2%
8. Indoor outdoor heat balance ratio: ± 2%
9. Control mode: manual control or automatic control
10. Laboratory specifications: 3HP air conditioning thermal balance laboratory, 5HP air conditioning thermal balance laboratory
Zhipinhui After-Sales Policy:
*After-Sales Hotline: +864008166687
1. Our company has assembled a team of experienced field engineers and senior technicians to promptly respond
to any equipment issues and provide after-sales maintenance.
2. Within China, within one week of new product delivery, our after-sales technical staff will install the equipment and
provide after-sales training at the customer's location, using the contact information and address provided by the customer.
3. All complaints related to product quality will be responded to within one hour. Within 3-5 hours within the province,
and within 24-48 hours outside the province, we will arrive at the customer's site,
determine the appropriate action based on the complaint, and provide after-sales repairs. (Domestic)
4. For international travel, our company can also arrange for an after-sales engineer to visit you for installation and
commissioning. Please discuss any travel and catering issues in advance.
We also provide video installation guides for you to choose from, providing you with a comprehensive and multi-faceted solution.
5. Any material costs related to product quality during the warranty period will be borne by our company.
6. During the warranty period, we will provide free repairs due to improper use or environmental factors.
The materials and accessories used for repairs will be charged at cost only.