ZHLR2S-100 Thermal Shock Test Chamber
1. Vertical two-box structure, automatic control of high and low temperature box cycle process, adjustable dwell and conversion time, divided into high temperature zone and low temperature zone, test samples are placed in the mobile hanging basket, adopting a unique heat storage and cold storage structure, the cylinder drives the hanging basket to move up and down in the hot and cold tanks to complete the hot and cold temperature shock test.
2. The test hole can be loaded with Peixian test components, large color screen touch mode computer control system, easy to operate, with abnormal and troubleshooting display function. The operating status is clear at a glance
3. Fully enclosed imported compressor + environmentally friendly refrigerant, plate-type heat exchanger and binary ultra-low temperature freezing system.
4. High temperature, low temperature and hot and cold shock three functions can be set independently. When executing hot and cold shock conditions, it has the function of high and low temperature test box, and can automatically pre-cool, preheat and standby functions according to the scheduled work, and can set the number of cycles and defrost times, automatic (manual) defrost
Specifications and Technical Parameters
Temperature impulse test chamber | ZHLR2S-100 | ZHLR2S-300 | ZHLR2S-500 | |||
Work room size(mm) | 460×460×480
| 680×680×650
| 780×780×850
| |||
Boundary dimension(mm) | 2000×1100×1650 | 2350×1360×2000 | 2500×1580×2200 | |||
Specifications | perature arrange | High | +60℃~200℃ | |||
low | -75℃~-10℃ | |||||
Precooling/preheating temperature | +200℃/-75℃ | |||||
Temperature deviation | ±2.0℃ | |||||
Heating/cooling time | About:40min(RT~200℃)/40min(RT~-75℃) | |||||
Temperture recovery | ≤5min | |||||
Basket weighing | 10Kg | 18Kg | 25Kg | |||
Refrigeration system | Refrigeration unit/mode | Imported German or French Tecumseh Copeland semi-hermetic compressor/dual cascade compression refrigeration | ||||
Cooling method | Water cooling(cooling water pressure:0.2~0.4Mpa,water temperature: ≤30℃) | |||||
Condenser | Stainless steel welded plate heat exchanger | |||||
Heater/evaporimeter | Nichrome electric heater/finned evaporator | |||||
circulating fan | Axial air machine | |||||
Cylinder | High&low temperature transfrom actuator | |||||
Air compressor | Compressed air of supply drive cylinder | |||||
Protection | Over temperature,over load,over pressure,leakage,cutting-out,power open phase,angular misalignment and protection | |||||
Material | Outer materials | SUS304# stainless steel treated with mist | ||||
Inner material | SUS304 Inner box is stainless steel | |||||
Insulation materials | Heat-resistance high-density aluminum silicate fiber cotton or foam insulator materials | |||||
Accessories | Test port hole,light,viewing window | |||||
Power | 380V±10%,50hz,3P+N-G | |||||
ZHLR2S-100 Thermal Shock Test Chamber
1. Vertical two-box structure, automatic control of high and low temperature box cycle process, adjustable dwell and conversion time, divided into high temperature zone and low temperature zone, test samples are placed in the mobile hanging basket, adopting a unique heat storage and cold storage structure, the cylinder drives the hanging basket to move up and down in the hot and cold tanks to complete the hot and cold temperature shock test.
2. The test hole can be loaded with Peixian test components, large color screen touch mode computer control system, easy to operate, with abnormal and troubleshooting display function. The operating status is clear at a glance
3. Fully enclosed imported compressor + environmentally friendly refrigerant, plate-type heat exchanger and binary ultra-low temperature freezing system.
4. High temperature, low temperature and hot and cold shock three functions can be set independently. When executing hot and cold shock conditions, it has the function of high and low temperature test box, and can automatically pre-cool, preheat and standby functions according to the scheduled work, and can set the number of cycles and defrost times, automatic (manual) defrost
Specifications and Technical Parameters
Temperature impulse test chamber | ZHLR2S-100 | ZHLR2S-300 | ZHLR2S-500 | |||
Work room size(mm) | 460×460×480
| 680×680×650
| 780×780×850
| |||
Boundary dimension(mm) | 2000×1100×1650 | 2350×1360×2000 | 2500×1580×2200 | |||
Specifications | perature arrange | High | +60℃~200℃ | |||
low | -75℃~-10℃ | |||||
Precooling/preheating temperature | +200℃/-75℃ | |||||
Temperature deviation | ±2.0℃ | |||||
Heating/cooling time | About:40min(RT~200℃)/40min(RT~-75℃) | |||||
Temperture recovery | ≤5min | |||||
Basket weighing | 10Kg | 18Kg | 25Kg | |||
Refrigeration system | Refrigeration unit/mode | Imported German or French Tecumseh Copeland semi-hermetic compressor/dual cascade compression refrigeration | ||||
Cooling method | Water cooling(cooling water pressure:0.2~0.4Mpa,water temperature: ≤30℃) | |||||
Condenser | Stainless steel welded plate heat exchanger | |||||
Heater/evaporimeter | Nichrome electric heater/finned evaporator | |||||
circulating fan | Axial air machine | |||||
Cylinder | High&low temperature transfrom actuator | |||||
Air compressor | Compressed air of supply drive cylinder | |||||
Protection | Over temperature,over load,over pressure,leakage,cutting-out,power open phase,angular misalignment and protection | |||||
Material | Outer materials | SUS304# stainless steel treated with mist | ||||
Inner material | SUS304 Inner box is stainless steel | |||||
Insulation materials | Heat-resistance high-density aluminum silicate fiber cotton or foam insulator materials | |||||
Accessories | Test port hole,light,viewing window | |||||
Power | 380V±10%,50hz,3P+N-G | |||||
Zhipinhui after-sales service
Equipment after-sales policy:
*Equipment warranty period: One Year
*After sales hotline: 4008166687
1. Our company has assembled a team of experienced on-site engineers and senior technicians who can respond promptly to any equipment issues and provide after-sales maintenance.
2. Within one week of the delivery of the new product, our after-sales technical department staff will provide installation and after-sales training for the equipment at the customer's location based on the contact information and address provided by the customer.
3. All complaints related to product quality will be responded to within 1 hour. Within 3-5 hours within the province and 24-48 hours outside the province, the customer will arrive at the scene and determine the handling measures based on the complaint situation, and carry out after-sales maintenance.
4. To better address customers' difficulties and concerns, our company promises that all maintenance personnel will be on call.
5. Any costs related to product quality during the shelf life will be borne by our company.
6. During the warranty period, we will provide free repairs due to improper use by your side or natural environment. The materials and accessories used for repairs will only be charged at cost price.