The equipment is fully monitored by PLC+software, and a gas flow meter is used to detect the corresponding flow of the test product. What are the requirements for the commercial air conditioning valve body flow test bench? Let's see how Guangzhou Zhipinhui Electronic Technology introduces it.
设备全程PLC+软件监控,采用气体流量计检测测试产品的对应流量。那商用空调阀体阀流量测试台有哪些要求,来看广州智品汇电子科技是如何介绍。
1. Power supply: AC220V 50HZ
2. Detection medium: air
3. Air source pressure: 0.8Mpa clean compressed air
4. Flow meter performance: The flow meter is equipped with three, with a range of 0-50L/min, 0-250L/min, and 0-1000L/min
5. Pressure reducing valve performance: Imported high-precision electrical proportional pressure regulating valve is used, with a sensitivity of 0.2%F.S and a repetitive accuracy within ±0.5%F.S.
6. Detection air pressure: 0.1~0.5Mpa compressed air (adjustable)